Repozitorij / Repository

1. Bušić, V.; Roca, S.; Vrandečić, K.; Ćosić, J.; Siber, T.; Gašo-Sokač, D.
Comparison of Conventional and Ultrasound-Assisted Green Synthesis of Quaternary Pyridinium Salts and Their Antifungal Activity. Appl. Sci. 2026, 16, 3470. https://doi.org/10.3390/app16073470
Opis istraživanja / About this research

2. Bušić, V.; Molnar, M.; Komar, M.; Tomac, I.; Kondža, M.; Jakovljević Kovač, M.; Habuda-Stanić, M.; Magdić, D.; Budić, L.; Gašo-Sokač, D.
Synthesis of Pyridines, Quinazolinones and Coumarins in Deep Eutectic Solvents: Principles, Methods and Applications. Molecules 2026, 31, 1503. https://doi.org/10.3390/molecules31091503

3. Gašo-Sokač, Dajana; Lončarić, Zdenko; Zobundžija, Dora; Milinković Katja; Magdić, Damir; Bušić, Valentina.
Synthesis of Acetylsalicylic Acid Catalysed by Food Industry Waste Ash: A Preliminary Study. Appl. Sci. 2026, 16(18), 9119
https://doi.org/10.3390/app16189119
_______________________________________________________________

Hodogram aktivnosti projekta EMSEO (48 mjeseci)

Ključne prekretnice projekta

Godišnji ciljevi (RP5)

Godina Glavni pokazatelji
1. Web stranica, baza podataka, 10 karakteriziranih spojeva, ≥2 međunarodne konferencije, 1 znanstveni rad, 1 diplomski/završni rad
2. 10 novih struktura, elektrokemijska analiza 10 uzoraka, ≥3 konferencije, 3 rada, 3 završna rada
3. 20 novih struktura, elektrokemijska analiza 10 uzoraka, ≥2 konferencije, 3 rada, 2 završna rada
4. 10 novih struktura, elektrokemijska analiza 10 uzoraka, ≥3 konferencije, 3 rada, 2 završna rada, završno izvješće

NAPOMENA: Ovaj hodogram sažima raspored svih radnih paketa i aktivnosti u projektu